Falta Cadena logo traintic

GW

This equipment controls the train bus (WTB) communication between various coupled units.

Two redundant gateways are fi tted per unit (GW1 and GW2) to improve availability. In each instant, only one of these shall be activated.

On starting the system, the Gateways of the various units communicate with each other to determine the current train confi guration. Once this process (known as Train inauguration) is complete, one of the Gateways takes control and controls the WTB communications in accordance with the confi guration of each Gateway. Once in normal operation, the inauguration is performed as many times as the train confi guration changes.

Download PDF
Parque Tecnológico de San Sebastián Paseo Mikeletegi 58, 2º - 20009 San Sebastián. Tfno: +34 943 309 251 Legal note